Macro of a galvanised steel framing system joint
PART OF ACERO GROUP — SFS, DRYLINING, CEILINGS & PLASTERING

ACERODRYLININGSteel framing, drylining and ceilings,
built to tolerance.

Submit a Tender

Steel framing, drylining, suspended ceilings, MF partitions, plastering and rendering for residential and commercial projects across the UK — one contractor, one programme, one accountable team from first fix to handover.

SECTION 01 / OUR SERVICES

Five disciplines.
One trade partner.

Acero Drylining — part of Acero Group — supplies steel framing systems, drylining, suspended ceilings, MF partitions, plastering and rendering as a single package. One contractor for all five elements means coordinated setting-out, one programme and clear accountability from first fix through to handover.

01

SFS — Load-Bearing & Infill

Load-bearing and non-load-bearing (infill) galvanised steel framing for residential and commercial projects. We set out the primary grid, fix studs and tracks to the agreed tolerance, and check every line before boarding begins.

02

Drylining

Plasterboard and composite board fixing for fire-rated, acoustic and impact-resistant walls and ceilings. Tape-and-joint or skim finishes, installed to BS 8212 standards across standard and complex wall details.

03

Suspended Ceilings

Metal-frame suspended ceiling systems, from exposed grid to concealed MF, rafted and bulkhead details. Fire-rated and acoustic builds set level to the architect's sections, on residential and commercial schemes.

04

MF Partitions & Ceilings

Internal metal stud partitions and MF ceilings, including intricate coffered and featured ceiling details. One package from frame to finished surface for high-end residential and commercial interiors.

05

Plastering & Rendering

Internal plastering and external rendering for residential and commercial projects. Skim and backing coats inside; sand and cement, monocouche and silicone render systems outside, finished level with correct beading, detailing and curing.

IN DETAIL / SFS, RESIDENTIAL, COMMERCIAL & EDUCATION
→LOAD-BEARING SFS — COMMERCIAL BLOCK, GALVANISED STEEL FRAME TO TOLERANCE
→RESIDENTIAL — COFFERED CEILING DETAIL, MF FRAME TO FINISHED PLASTER
→RENDER SYSTEMS — THROUGH-COLOURED SILICONE RENDER, FINISHED ELEVATIONS
→COMMERCIAL — OFFICE FIT-OUT, FEATURE CEILING RAFTS & PARTITIONS
→EDUCATION — SCHOOL CORRIDOR & CLASSROOM FINISHES
SECTION 02 / TENDER PORTAL

From viewer
to partner.

This is a technical Request for Quote — not a contact box. Answer four qualifiers and we route your tender directly to a senior estimator. You will receive a structured response within two working days.

→Senior estimator assigned on receipt
→Structured response within 2 working days
→NDA available on request
01
02
03
04
STEP 01 / DISCIPLINE

Service required